Rail Industry urges EU leaders to act on dedicated Industrial Strategy
As Europe risks losing its grip on the global rail market, UNIFE calls on EU Transport Ministers to use their high-level Council meeting on 30 November to begin shaping an EU Rail Industrial Strategy.
UNIFE Director General Enno Wiebe today called the upcoming meeting ‘critical’, urging the European Commission to act and deliver a dedicated rail industry strategy, as China and other global players rapidly catch up while also not playing by the same rules.
In June, ten EU Members States – Austria, Croatia, France, Germany, Greece, Italy, Luxembourg, Poland, Portugal, Spain and Romania – supported and called on the European Commission to develop a dedicated industrial strategy.
Any EU Rail Industrial Rail Strategy should:
- Finally deliver a Europe-wide rail network by fast-tracking ERTMS® (European Rail Traffic Management System) deployment, simplifying vehicle authorisations, and ‘stabilising changes’ to Technical Specifications for Interoperability (TSIs).
- Acknowledge specificities of B2B and rail business - Laws written for everyday consumer products (e.g. Cyber-Resilience Act) are creating significant cost and complexities for industry when applied to business to business (B2B) contexts. This is especially true for complex rail equipment and contractual arrangements with near 40-year lifecycles.
- Continue strengthening the EU industry and trade toolbox – Enforce and close loopholes in the Foreign Subsidies Regulation to prevent operators identified as distortive from participating in public procurement procedures and from benefitting EU funds, introduce European preference rules that work for industry through the Public Procurement Act.
- Increase the EU budget for rail - Launch a dedicated public-private research partnership in the next EU budget, while dramatically increasing funding through the Connecting Europe Facility and the European Competitiveness Fund.
The EU rail supply industry - which is worth €62,6 billion annually and supports 650.000 high-quality jobs including construction - has distinctive characteristics and needs that set it apart from most other manufacturing sectors.
Projects typically take between 10 and 14 years from tender to delivery, including up to seven years for design, testing and authorisation. Also, trains and signalling systems remain in service up to 30 to 40 years. Reducing these times is critical for cost and delivery purposes.
According to the World Rail Market Study 2026, EU rail supply companies can now only access 56% of the world’s global rail markets, down from 59% in the previous study (2024), and from 61% in 2022. This now costs EU industry around €97 billion per year in missed business opportunities.
Quotes attributable to UNIFE Director General Enno Wiebe
“Our industry is strategic – critical to Europe’s sovereignty, growth and military mobility. The next EU Transport Ministers meeting is critical in convincing the undecided on the merits of a dedicated industrial strategy for rail supply.”
“We are one of the only remaining competitive industries, but this position is being challenged. We can help solve pressing EU problems and needs across transport, innovation, military mobility and growth, but we need to be adequately prepared for the future.”
“Any framework must be lean and proportionate, allowing our industry with its distinct business needs to thrive. We need to ensure that any gains made from reforms such as Public Procurement and other regulation cannot be erased by complexity”.
